Centre Park, Warrington, Cheshire

Project

Centre Park was constructed on the site of former paper mill adjacent to the River Mersey close to Warrington Town Centre. To develop the site extensive remediation was required together with design and construction of a 30m span through truss steel bridge, a network of adoptable roads and sewers and extensive landscaping.

Centre Park is now a very successful town centre office park, which has seen each speculative phase of development fully let, with further development planned. Detached office buildings of 5-10,000 sq ft are arranged around a quality landscaped environment, and complemented by facilities provided by a Village Hotel and Leisure Club, Travel Inn and Beefeater public house.

QUALSURV's involvement

QUALSURV's Operations Director, as the Employer's Representative, was responsible for planning, design, marketing and construction of the initial phase of the project, the infrastructure, the Village Hotel, bespoke and speculative offices and commercial premises.

Download this information

Chipping Warden / Portbury Docks

Project

Chipping Warden is the site of a disused World War II airbase and is one of a number of logistic depots operated by Autologic Holdings.

Portbury is one of largest facilities operated by Autologic Holdings and QUALSURV acted as Employer's Representative managing a number of schemes within the site.

QUALSURV's involvement

QUALSURV was responsible for a range of schemes for upgrading parking and transit areas within the complex. Our role included site appraisal, investigation and survey, production of drawings, specification and tender enquiries.

Download this information

Proposed Rail Crossing, Hill Top Development

Project

Proposals for an at-grade rail crossing to provide new access to industrial and commercial development land currently served by an underbridge with restricted headroom. The new crossing and future station will be approached by a new highway constructed on embankments adjacent to Midland Metro Line 1.

QUALSURV's involvement

QUALSURV assisted the Client with an HMRI Application and a Legal Agreement with the infrastructure owner and Duty Holder. In addition, it provided pretender construction, contractual and procurement advice to client Metropolitan Estates Ltd including a detailed tender programme for the installation of the proposed level crossing on the live railway.

Download this information

Rugeley Power Station, FGD Civils Works

Project

As part of the Government's drive to reduce the UK's contribution to acid rain, coal and oil-fired power stations in the UK became subject to much tougher sulphur dioxide emission targets from 2008 onwards. Flue Gas De-sulphurisation (FGD) is one of the techniques being used to control these emissions. Installation of FGD has enabled continued clean coal fired generation at Rugeley. This in turn increased fuel diversity in the UK.

The civil engineering element of this project included the construction of massive reinforced concrete foundations for the Absorbers, Process Plant and Equipment, together with a materials handling depot adjacent to freight railway tracks.

QUALSURV's involvement

QUALSURV staff were very closely involved in securing the £12.5m civils package through EPC Contractor Lentjes (UK).

Download this information

A69 Haltwhistle Bypass

Project

The A69 Carlisle – Newcastle was the first contract in the £1billion Design, Build, Finance and Operate (DBFO) programme. The contract was awarded to Road Link (A69) Ltd a consortium of six companies comprising Morrison Construction, Christiani & Nielsen Ltd, Henry Boot Construction, Impregilo S.p.A, ASTM SINA and Pell Frischmann.

The Bypass (built to relieve traffic using the A69 through Haltwhistle and reduce accident, congestion, air pollution, noise and vibration) is approximately 3.5 kilometres long and required the construction of 3 major structures; 2 bridge crossings of the river South Tyne and a bridge crossing the Newcastle to Carlisle Railway. The bypass is a single carriageway with metre wide strips over the whole length.

QUALSURV's involvement

QUALSURV staff were closely involved in both the construction and commercial management of the project.

Download this information

A550 Deeside Park Interchange

Project

This £12m Design and Construct highway project for the Welsh Office consisted of the construction of a grade separated interchange over the existing A550 trunk road together with the construction of a dual carriageway link to the Deeside Bridge crossing.

QUALSURV's involvement

QUALSURV staff were responsible for the management of this lump sum contract, which included detailed design and statutory undertaker's diversionary works.

Download this information

Renewable Energy Park, Warwickshire

Project

QUALSURV have been appointed as Project Managers by their client, Park Top Ltd, to provide strategic advice and project management services for this Renewable Energy project.

This £25m development consists of the remediation of a former colliery shale tip, the formation of a 3ha platform suitably prepared for the construction of Anaerobic Digestion and Biomass waste to energy plants, screened by extensive earth mounds, together with drainage and highway works.

QUALSURV's involvement

QUALSURV have devised the procurement strategy, prepared the project budget, procured and managed the site investigation, procured and managed the civil engineering design contract and are currently finalising tender documentation for a civil engineering infrastructure enquiry.

Download this information